Fort Worth banner
 
Fort Worth banner Departmental left image Departmental title image Departmental right image Fort Worth banner


Storm Water Quality

Industrial Inspection Program

Most industrial facilities in Fort Worth that require storm water permitting apply for coverage under the Multi-Sector General Permit TXR050000. Other possible permitting options include individual permits; TXR340000 - General Permit for Water Discharges from Petroleum Bulk Stations and Terminals; and TXG110000 - General Permit for Water Discharges from Concrete Production.

Storm water permit coverage requirements are determined by a facility’s Standard Industrial Classification (SIC) code. More information on which industries require storm water permit coverage is available on the TCEQ web site at:
www.tceq.state.tx.us/permitting/water_quality/stormwater/TXR05_AIR.html.

NOTE: The TPDES Multi-Sector General Permit (TXR050000) was renewed on August 14, 2006. Facilities with coverage under the previous MSGP have until November 13, 2006 to submit a new Notice of Intent (NOI) if applying by mail or until December 12, 2006 if submitting electronically.

Fort Worth Inspections
Jimmy McClurg
817-871-5463
email: 
Jimmy.McClurg@fortworthgov.org

Jerome Jackson
817-871-5461
email: 
Jerome.Jackson@fortworthgov.org 


TCEQ Storm Water Hotlines
The TCEQ hotline for general information is 512-239-3700
For technical questions only, call 512-239-4433